Location

Kwajalein Island, Kwajalein Atoll, Republic of the Marshall Islands

Experience Capabilities

• Architecture

• Civil Engineering

• Structural Engineering

• Electrical Engineering

• Mechanical Engineering

• Project Management

• Corrosion Control and Mitigation

• Environmental Engineering

• Geotechnical Engineering

• Preparation of Drawings

• Specifications and Design Analysis

Client

USACE

Size

$13M

CompletionEst. 2026

Potable Water Tower Replacement

This project entails demolition of a nearly 70-year-old potable water tower and replacing it with a modern 100,000 gallon tank and a 123 foot tower. This critical infrastructure upgrade will enhance the reliability of the outdated system and ensure a safe source of drinking water and reserve capacity for fire suppression

Next
Next

Repair Fuel Systems POL Lines & ASTs [Marshall Islands]